Generator Site Plan for a Permit: What to Measure Before You Draw

Many jurisdictions want a site plan showing where the generator sits in relation to the house, property lines and other site features. A useful precheck starts with the same measurements.

Check a location in the planner →

What a generator site plan is trying to prove

A permit reviewer needs enough spatial information to understand the proposed equipment location and whether the plan appears to meet applicable rules. Requirements vary by jurisdiction, but generator checklists commonly ask for the generator location, lot boundaries, building outline and dimensions to relevant features.

Professional site-plan services also emphasize clearances to doors, windows, air intakes, property lines and easements because these are frequent reasons a proposed location must change.

Measurements worth collecting before the permit form

ItemWhat to record
PropertyLot lines, relevant dimensions, easements and north/orientation if the jurisdiction requests it.
HouseExterior wall shape and the proposed generator side.
OpeningsNearby windows, doors, vents and fresh-air intakes.
GeneratorMake/model, enclosure footprint, orientation and pad location.
UtilitiesGas/propane source, electrical service, meter/panel/ATS locations and proposed route where required.
Other constraintsFences, A/C equipment, drainage, decks/overhangs, flood requirements or other locally requested features.

Use the planner before paying for final drafting

WattageFit is not a permit drawing tool and does not use survey-grade parcel data. Its value is earlier: test whether a candidate side-yard location already conflicts with a known wall/opening requirement or the local setback you enter. If it does, you can move the conceptual location before ordering a survey, CAD plan or installer package.

What not to submit from this tool

Do not treat the on-screen yard sketch as a scaled survey, stamped plan, engineered drawing or proof of code compliance. If your authority requires a certified survey, professional design or engineer stamp, use the required professional deliverable.

Useful reference

Example of information commonly included in a commercial generator permit site-plan service ↗. This external service is referenced as an example of permit-plan scope; WattageFit is not affiliated with it.

Related generator planning guides

Generator distance from house →Window / opening clearance →Property-line setback →Generator site plan →Generac placement →Champion placement →Cummins placement →
Planning boundary: this material is for pre-planning. The exact model installation manual, current local code, permits and qualified installers or inspectors control the actual installation.